{"product_id":"lockout-tagout-templates","title":"Lockout Tagout Templates","description":"\u003ch1\u003eLockout Tagout Documents - Compliance Template Package\u003c\/h1\u003e\n\u003cp\u003eMissing or incomplete de-energization and lockout tagout documentation is one of the most common OHS inspection findings, resulting in a stop work order or penalty. Get your documentation in place before an officer asks for it.\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003ch2\u003eWhat’s Included in this Package\u003c\/h2\u003e\n\u003cp\u003eWe have designed \u003cstrong\u003e6\u003c\/strong\u003e editable documents that will help you prepare for and stay compliant with lockout tagout regulations, such as:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003ca href=\"https:\/\/kings-printer.alberta.ca\/documents\/OHS\/OHSCode_March_31,_2025_(rep_s850)_only.pdf\" rel=\"noopener\" target=\"_blank\"\u003e\u003c\/a\u003e\u003ca href=\"https:\/\/kings-printer.alberta.ca\/documents\/OHS\/OHSCode_March_31,_2025_(rep_s850)_only.pdf\" title=\"AB OHSR Part 15 Managing the Control of Hazardous Energy\" rel=\"noopener\" target=\"_blank\"\u003eAB OHSR - Part 15 Managing the Control of Hazardous Energy\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"https:\/\/www.worksafebc.com\/en\/law-policy\/occupational-health-safety\/searchable-ohs-regulation\/ohs-regulation\/part-10-de-energization-and-lockout\" title=\"BC OHSR - Part 10 De-Energization \u0026amp; Lockout\" rel=\"noopener\" target=\"_blank\"\u003eBC OHSR - Part 10 De-Energization \u0026amp; Lockout\u003c\/a\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eCustomize each one with your own company logo, header, footer and content. Available in Microsoft Word, Apple Pages and PDF.\u003c\/p\u003e\n\u003ch3\u003eLockout Tagout Request Form\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eBefore any machinery, equipment, or system can be de-energized, the work must be formally requested and approved; usually by the maintenance department or a specialty contractor performing the isolation.\u003c\/li\u003e\n\u003cli\u003eThis template captures the equipment being de-energized, the type of hazardous energy involved, the reason for de-energizing, affected departments or personnel, and the responsible parties (supervisor, person performing de-energization, person verifying zero energy); creating the paper trail an OHS officer expects to see before work starts.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eLockout Tagout De-Energization Plan\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eOnce the request is approved, this plan defines exactly how the isolation will be carried out. This is the document an OHS officer will review most closely, since it shows the isolation was planned in advance rather than improvised on the spot.\u003c\/li\u003e\n\u003cli\u003eThis template identifies all the sources of energy (switches, circuits, valves) that must be isolated and locked, the sequence and procedures for isolation, methods to test for zero energy, and methods to control residual energy.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eLockout Tagout De-Energization Spreadsheet\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eThe sequence for de-energizing and isolating can become complex on large systems that have multiple energy sources.\u003c\/li\u003e\n\u003cli\u003eThis template helps you plan in sequential order.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eLockout Tagout Re-Energization Plan\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eSafe re-energization is just as important as de-energization.\u003c\/li\u003e\n\u003cli\u003eThis template is the reverse step by step procedures to return the energy sources back to the machinery, equipment or system.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eLockout Tagout Personal Lock Log\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eAll workers who work on machinery, equipment or system that is locked out and tagged out must attach a personal lock as a means of protecting themselves from energy startup.\u003c\/li\u003e\n\u003cli\u003eThis template records each event (date and time) a worker locks on and removes their personal lock from the locked out machinery, equipment or system.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eLockout Tagout Personal Tag\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eEvery worker's personal lock must be traceable to the person who applied it, so it isn't mistaken for someone else's or removed before they're clear of the equipment.\u003c\/li\u003e\n\u003cli\u003eThis template captures the worker's name and contact number; giving the supervisor a quick way to confirm who's still on the system before re-energizing.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003ch2\u003eComplete Your Compliance with Lockout Tagout Training\u003c\/h2\u003e\n\u003cp\u003e\u003ca href=\"https:\/\/ooshew.org\/products\/lockout-tagout\" title=\"Lockout Tagout Training\" rel=\"noopener\" target=\"_blank\"\u003eLockout Tagout Training\u003c\/a\u003e\u003c\/p\u003e","brand":"OOSHEW","offers":[{"title":"Default Title","offer_id":43191742201918,"sku":null,"price":395.0,"currency_code":"CAD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0992\/0388\/files\/LockoutTagout.jpg?v=1696877978","url":"https:\/\/ooshew.org\/products\/lockout-tagout-templates","provider":"OOSHEW","version":"1.0","type":"link"}